Pump body base mould

Facebook
Twitter
LinkedIn

Product material: ADC12
Product size length * width * height (mm): 380*286*120
Product Industry: Industry

Mold parameters
Number of mold cavities: 1*1
Number of rows: 1
Mould structure: 2 plate moulds
Machine tonnage: 400T
Mold size (mm): 680*580*560
Mold processing time: 35 days (not including pre-design and development)

Mold Making Processes
Mold making is a complex process that requires a high level of skill and experience. Although each case is different, a typical order for a set of molds may go something like this:
1. DFM
As soon as the customer confirms the order of molds, we will start to do an initial analysis of the parts to get an idea of the part line, gate positions, etc.
2. Mold design and mold flow analysis
The second step involves the use of predictive modeling software which allows us to see how the molten material will behave when it enters the mold, allowing for further improvements to the design.
3. CNC machining and EDM
We make the first molds using high-quality machining equipment, with the plastic, steel, aluminum, etc. chosen by the customer.
4. T1 sample
With the newly made molds, we make a T1 sample to have a clear vision of how the customer’s final molded parts will turn out.
5. Improvement if necessary
Based on our analysis of the T1 sample, we review the mold design and make any adjustments needed.
6. Commence production and shipping
We manufacture the molds in accordance with the final specifications before shipping them to the customer.

What is mold making and when do you need it?Molds are normally created to duplicate plastic and metal parts. After testing the prototypes and the market, it is the most cost-efficient way to launch your products at scale.
Should I choose a locally produced mold or an exported mold?Generally speaking, making plastic or metal molds (and moldings) is cheaper in China than other countries. But shipping costs should also be considered: you will need to use air freight if you have a tight schedule; sea freight is much cheaper, but will usually take 40 days or more.